Page 11 - Nemko - Corporate brochure - English
P. 11

Gain confidence in your product’s design

                                            before certification, saving time and cost.








            From product design, prototype testing, through to production and market launch, you can rely
            on Nemko to guide you through all regulatory requirements and specific requirements from your
            customers.
            Our product pre-compliance services include:       We find the answers you need:
            •  Pre-evaluation                                  •  Which category does your product belong
            •  Pre-testing                                        to?
            •  Certification and international approval        •  In what kind of environment will it be used?
               recommendations                                 •  Which critical components make up your
                                                                  product?
                                                               •  Which product standards are relevant for
                                                                  your product?








              “For us it was important to have a partner we could talk to who knows the rules and regulations
                                     and could guide us through the entire process.”

                                           Marius Aabel, No Isolation co-founder



            When tech startup No Isolation went from           With our pre-testing services, they knew they
            the prototype phase to the production design       were ensuring that the product development
            phase of their innovative AV1 robot, they          process was on track, avoiding non-conformities
            came to Nemko. The remotely operated robot         before production. In addition, they could use
            becomes the classroom ‘eyes and ears’ of           test results as the basis for certification and
            children absent from school with long-term         international approval.
            illness. No Isolation’s goal was to bring children   During the design phase of development, No
            back into the classroom, allowing them to see,     Isolation engineers were frequent visitors to
            hear and speak to their classmates through         the Nemko lab. Through access to our skilled
            an app on a mobile device with encrypted           engineers and laboratories, the design phase of
            connections.                                       AV1 was completed in a more efficient way.













                                                                                                            9
   6   7   8   9   10   11   12   13   14   15   16